sell
- There is no classification
contact
- Contact:张强
- Phone:05375656007
link
|
|
photo |
Title |
Updated |
|
Weifang installation grouting material manufacturer The grouting material is formulated with high-strength materials as aggregates, cement as binding agent, and supplemented by high fluidity, micro-expansion, anti-segregation and other substances. It can be used after adding a certain amount of water at the construction site and stirring evenly. Has good self-flowing properties
|
2016-11-10 |
|
Xuzhou installation grouting material manufacturer The grouting material is formulated with high-strength materials as aggregates, cement as binding agent, and supplemented by high fluidity, micro-expansion, anti-segregation and other substances. It can be used after adding a certain amount of water at the construction site and stirring evenly. Has good self-flowing properties
|
2016-11-10 |
|
Xuzhou reinforcement grouting material market price The grouting material is formulated with high-strength materials as aggregates, cement as binding agent, and supplemented by high fluidity, micro-expansion, anti-segregation and other substances. It can be used after adding a certain amount of water at the construction site and stirring evenly. Has good self-flowing properties
|
2016-11-10 |
|
Xuzhou grouting material universal grouting material manufacturer Product Features 1. Early strength, high strength, production can be started within one day after equipment installation 2. High flow state, no bleeding, anti-rust 3. Dual effect of compound expansion, precise positioning 4. According to the correct grouting construction technology, it can reach 90% effective bearer
|
2016-11-09 |
|
Heze machine base installation grouting material manufacturer Winter construction 1) When the daily average temperature is lower than 5℃, winter construction should be carried out and meet the following requirements: 2) Before grouting, measures should be taken to preheat the foundation surface to keep the temperature above 10℃ and remove accumulated water; 3) Should Use no more than 65℃
|
2016-11-09 |
|
Heze anchor bolt grouting material manufacturer Anchor bolt grouting 1) The construction technology of anchor bolts should comply with the requirements of Appendix B. 2) When forming holes for anchor bolts, the horizontal deviation of the bolt holes shall not be greater than 5 mm, and the vertical deviation shall not be greater than 5 mm. 2) The bolt hole wall should be rough and the
|
2016-11-09 |
|
Price of special grouting material for reinforcement in Tengzhou Concrete structure modification and reinforcement grouting 1) The concrete surface in contact with the cement-based grouting material should be fully roughened. 2) To repair concrete structural defects, the loose concrete should be removed and the steel bars should be exposed, and the edges of the repair area should be cut into vertical shapes.
|
2016-11-07 |
|
Xuzhou concrete secondary grouting material manufacturer , Application of technical specifications for construction preparation 1) Construction site quality management should have corresponding construction technical standards, sound quality management system, construction quality control and quality inspection system. There should be a construction organization design or construction technology plan before grouting
|
2016-11-07 |
|