sell
- There is no classification
contact
- Contact:张强
- Phone:05375656007
link
|
|
photo |
Title |
Updated |
|
Heze universal grouting material manufacturer CGM high-strength non-shrinkage grouting material, product features 1. Early strength, high strength, production can be started within one day after the equipment is installed 2. High flow state, no bleeding, anti-rust 3. Dual effect of compound expansion, precise positioning 4. Press the correct Grouting construction
|
2016-11-07 |
|
Juancheng installation grouting material manufacturer Secondary grouting of equipment foundation: ⑴ Before grouting, the equipment floor and concrete foundation surface in contact with grouting materials should be cleaned, and there should be no loose gravel, floating slurry, floating ash, oil stains, wax, etc. 24 hours before grouting, the foundation concrete surface
|
2016-11-04 |
|
Zoucheng equipment installation grouting material manufacturer The grouting material is formulated with high-strength materials as aggregates, cement as binding agent, and supplemented by high fluidity, micro-expansion, anti-segregation and other substances. It can be used after adding a certain amount of water at the construction site and stirring evenly. Has good self-flowing properties
|
2016-11-04 |
|
Juye special grouting material manufacturer price Features ▲Early and high-strength strength can reach over 30Mpa 1-3 days after pouring, shortening the construction period. ▲In the self-flowing state, you only need to add water and stir on site, and then pour it directly into the equipment foundation. The mortar will flow by itself and the construction will be vibration-free, ensuring vibration-free and long-distance grouting construction. ▲
|
2016-11-04 |
|
Heze emergency repair grouting material manufacturer direct sales Grouting materials are mainly used for: anchor bolt anchoring, emergency repair of aircraft runways, fixation of nuclear power equipment, reinforcement of road and bridge projects, machine bases, steel structures and foundation pockets, secondary grouting of equipment foundations, buried steel bars, and concrete structure reinforcement.
|
2016-11-04 |
|
Heze reinforcement grouting material manufacturer The following requirements should be met during grouting construction: 1). The grout should be poured from one side until it overflows from the other side, so as to facilitate the discharge of the air between the equipment base and the concrete foundation and enrich the grouting. It should not be carried out from four sides at the same time. Grouting. 2).
|
2016-11-04 |
|
Tengzhou reinforcement grouting material manufacturer direct sales Conventional physical properties of grouting materials Construction methods 1. Mixing machines, grouting equipment, templates and maintenance items should be prepared before grouting construction. 2. During secondary grouting, the horizontal distance between the formwork and the equipment base should be controlled at about 100mm;
|
2016-11-01 |
|
Xuecheng grouting material factory direct sales Conventional physical properties of grouting materials Construction methods 1. Mixing machines, grouting equipment, templates and maintenance items should be prepared before grouting construction. 2. During secondary grouting, the horizontal distance between the formwork and the equipment base should be controlled at about 100mm;
|
2016-11-01 |
|