& Conventional physical properties of grouting materials Construction methods
Mixing machines, grouting equipment, templates and maintenance items should be prepared before grouting construction.
During secondary grouting, the horizontal distance between the formwork and the equipment base should be controlled so that the top elevation of the left and right formwork should not be lower than the upper surface of the equipment base.
When the concrete structure is renovated and reinforced, sufficient grouting holes and exhaust holes should be left in the formwork support. The grouting hole diameter should not be smaller than the grouting hole and the spacing should not exceed the spacing.
When mixing cement-based grouting materials, water should be added according to the water consumption required by the product. Mechanical mixing should be used. When mixing, it is advisable to first add / of water to mix for about 1/2, then add the remaining water and mix until uniform. The mixing location should be close to the grouting location.
Linyi reinforcement special grouting material