Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Beijing Huabao Vision Construction Technology Co., Ltd.

Reinforcement of road and bridge projects, reinforcement and renovation of co...

sell
  • There is no classification
contact
  • Contact:张强
  • Phone:05375656007
search
 
link
  • There is no link yet
home > sell > Linyi reinforcement special grouting material
Linyi reinforcement special grouting material
products: Views:5Linyi reinforcement special grouting material 
brand: 华宝远景
规格: 50kg/袋
强度: c60
包装: 防潮牛皮纸袋
price: 700.00元/吨
MOQ: 1 吨
Total supply: 1111 吨
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-10-21 14:58
 
Details
& Conventional physical properties of grouting materials Construction methods
Mixing machines, grouting equipment, templates and maintenance items should be prepared before grouting construction.
During secondary grouting, the horizontal distance between the formwork and the equipment base should be controlled so that the top elevation of the left and right formwork should not be lower than the upper surface of the equipment base.
When the concrete structure is renovated and reinforced, sufficient grouting holes and exhaust holes should be left in the formwork support. The grouting hole diameter should not be smaller than the grouting hole and the spacing should not exceed the spacing.
When mixing cement-based grouting materials, water should be added according to the water consumption required by the product. Mechanical mixing should be used. When mixing, it is advisable to first add / of water to mix for about 1/2, then add the remaining water and mix until uniform. The mixing location should be close to the grouting location.
Request for quotation
A total of0articles  Related Comments: