Rizhao track cement market
products: Views:6Rizhao track cement market 
brand: 华宝远景
规格: 50kg/袋
强度: c60
包装: 防潮牛皮纸袋
price: 1500.00元/吨
MOQ: 1 吨
Total supply: 1111 吨
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-10-20 10:14
 
Details
&C track cement is a kind of material containing selected natural aggregates, which has excellent fluidity, high compressive strength, long working time, economical, dense, no shrinkage, no rust, does not contain metal aggregates, easy construction, and lasting Special track cement with enhanced, good bonding performance and toughness
1. Scope of application
Grouting of track grooves of cranes in ports and terminals. (Used for track plate grouting, base plate bolt fixing, etc.)
Installation of various mechanical equipment, steel structure support foundation, anchor bolt hole grouting, etc.
2. Product performance
Fluidity
Vertical expansion rate (%)
Compressive strength
Primary grouting thickness
Reference
Water consumption
Standard dosage
&.
R
R
R
%~%
/
The above data are under standard laboratory conditions Measured below
For detailed product application technology, please refer to the "Technical Specifications for the Application of Cement-based Grouting Materials" in Technical Support
3. Construction method
Preparation before construction:
Clean the surface of the track foundation , hours before grouting, the track foundation surface should be fully moist. Hours before grouting, accumulated water should be sucked away.
Set up the formwork according to the grouting construction drawing, and the formwork must not leak grout.
If grouting occurs during grouting, it should be dealt with in time.
When grouting track cement materials, the process should meet the following requirements:
When the track cement is used for secondary grouting, it should be grouted from one side until it overflows from the other side. Grouting should not be performed from four sides at the same time.
After grouting begins, it must be carried out continuously without interruption, and the grouting time should be shortened as much as possible.
Vibration is strictly prohibited during the grouting process. If necessary, bamboo slats can be used for pulling and diversion.
The thickness of each grouting should not be exceeded. When the grouting layer is smaller than the thickness, corresponding auxiliary measures should be taken or other types of materials should be used.
Do not transmit the vibration of the running machine to the equipment foundation prepared for grouting.
, The time required for the initial solidification of C track cement grouting is about ~ hours.
After ~ an hour, use visual inspection and hand feel to check whether it has initially set. After confirming the first set, use a knife to lightly smooth the surface, and then cover the surface with linen or cotton cloth.
, According to the temperature difference every day, if the temperature is below ℃, water should be cured once in the morning and evening.
, perform moist curing on the solidified track cement for no less than a day.