& Maintenance) Within minutes after the grouting is completed, the curing agent should be sprayed immediately or covered with plastic film and covered with rock wool quilts for curing, or water should be sprayed for moisturizing and curing immediately after the grouting layer is finally set.
) During winter construction, maintenance measures should also comply with the relevant provisions of the current "Construction Acceptance Code for Reinforced Concrete Projects" (B).
) Curing time and mold removal schedule under different temperature conditions
Temperature (℃) Mold removal time and curing time
~
~
~
&
Application scope of grouting materials
Primary grouting and secondary grouting for equipment foundations that require high-precision installation.
Reinforcement bar embedding and anchor bolt anchoring in construction and geotechnical engineering.
Building reinforcement and renovation project, pouring of beam-column joints, deformation joints, and construction joints.
Used in emergency repair construction of roads, bridges, tunnels, airports and other projects.
Anchorage construction of railway sleepers.
Column wet-clad steel reinforcement is used for pouring angle steel and column gap joints.
Power plant reinforcement grouting material manufacturer